Cal Offset Printers
This Cal Offset Printer facility is a large, industrial printing plant with water-cooled printing presses. Energy cost fluctuations are very challenging for operations and profitability.
Solution:
Among other low cost measures, this project…

Johns Manville
Johns Manville, a global manufacturer of building materials, spent more than $200 million a year on energy. So the slightest fluctuation wreaks havoc on their budgeting and materials prices.
Services Provided:
Energy Master Planning
Energy…

MW Services
MW Services a general contractor for the US Government was opening a new office in Oceanside, California. In order to achieve LEED Certification for their office space, they turned to 3FFICIENT to assist with Fundamental Commissioning and certification…

Galleria Mall
The Glendale Galleria is a giant, 1.2M square foot urban shopping mall with rooftop air conditioning units serving each tenant. An attached 8 story commercial office tower is cooled by a 4-pipe chilled water / hot water system.
3FFICIENT staff…

101 N Brand
Dramatic energy price increases caught the attention of the property manager at this prestigious class A high rise in the center of Glendale's commercial district. With very discerning tenants and a need to keep them satisfied, CBRE recognized…

330 N Brand
This class A commercial building, located in Glendale California was built very efficiently for its time. However, the property manager realized that with changing technologies and rising energy costs, they needed to investigate improvements.…

505 N Brand
This class A commercial building, located in Glendale California was built very efficiently for its time. However, the property manager realized that with changing technologies and rising energy costs, they needed to investigate improvements.…

550 N Brand
This class A commercial building, located in Glendale California was built very efficiently for its time and had even won a BOMA award. However, the owner's recognized that energy efficiency raises property values, keeps costs down and reduces…

700 N Central
This class A commercial building, located in Glendale California was built pretty efficiently for its time. However, the property manager knew that with changing technologies and rising energy costs, they needed to investigate improvements.…

Glendale M.O.B.
A doctor's group had a lot of comfort complaints in their 3-story medical office building. When they asked the engineers at the large hospital next door for ideas, they were referred to a 3FFICIENT engineer to diagnose and resolve their challenges.
3FFICIENT's…

801 N Brand
This class A commercial building, located in Glendale California was built pretty efficiently for its time. However, the property manager realized that with changing technologies and rising energy costs, they needed to investigate improvements.…

Glendale Adventist Med Ctr.
Glendale Water & Power needed their largest customer to reduce demand and energy usage. Adventist Healthcare wanted to reduce costs, but was facing major seismic upgrades required by the state.
The campus had been built out over many years.…

Glendale Hilton
The prestigious Hilton in Glendale is a beautiful nineteen story high rise. At 270,000 square feet, with 350 guest rooms, associated restaurants, lounges, and conference rooms, the staff here have a lot of high profile business guests and high…

Sheraton Hotel
Set along the beautiful San Diego Harbor, the Sheraton with over 1,044 guest rooms and 120,000 SF of meeting space offers rich scenic views and relaxing comfort year round. A new Director of Engineering came from the world famous Hotel Del Coronado,…