New Search

If you are not happy with the results below please do another search

18 search results for:

1

Fletcher MOB

This 82,000 SF medical office building was due for a remodel.  The entries are enclosed with architectural smoked glass curtain walls.  Unfortunately, they felt more like a sauna.  A comfort issue the building occupants had endured for years.  Instead of putting in costly air conditioning, the owners were looking for more passive upgrades.  Something that […]

2

Edwards Life Sciences

Know anybody who has had a heart valve replacement?  With over 106,000 replacements a year, chances are you do and may not even know it.  Edwards Life Sciences is known for their transcatheter heart valves.  With a growing campus in sunny Southern California, they inherently knew their sky high electric bills were heavily impacted by […]

3

Mobil Convenience Stores

Client: Mobil Location: Los Angeles, California Challenge: Mobil gas stations, like many retailers and convenience stores, suffer with severe solar heat gain through windows and even roofs, resulting in damaged merchandise and higher cooling costs. Solution: Liquid Nanotint and super insulating Roof Protect thermal paint were added to sunscreen the building, protecting it from the sun’s […]

4

Little Company of Mary Med Ctr.

Location: Torrance, California, USA Challenge: Existing hospital windows were not sufficiently insulated to deal with hot weather.  This also drove up cooling costs. Solution: Liquid Window Insulation was used to reduce solar heat gain, boost building glass performance and block 100% of UVA/UVB rays while increasing thermal comfort for patients and administrators.

5

YMCA

The YMCA needed major HVAC upgrades and just didn’t have the capital funding.  So instead of continuing to defer maintenance or make “bandaid” repairs, they asked for help to figure out the root cause(s). Solution: This project solved some problems that had been plaguing staff for years. The basement lockers near the showers would literally […]

6

MW Services

MW Services a general contractor for the US Government was opening a new office in Oceanside, California. In order to achieve LEED Certification for their office space, they turned to 3FFICIENT to assist with Fundamental Commissioning and certification assistance of their Commercial Interiors office buildout. 3FFICIENT developed a commissioning plan and report to satisfy LEED-CI […]

7

Galleria Mall

The Glendale Galleria is a giant, 1.2M square foot urban shopping mall with rooftop air conditioning units serving each tenant. An attached 8 story commercial office tower is cooled by a 4-pipe chilled water / hot water system. 3FFICIENT staff analyzed their energy use and provided an investment grade engineering study that would later be […]

8

101 N Brand

Dramatic energy price increases caught the attention of the property manager at this prestigious class A high rise in the center of Glendale’s commercial district. With very discerning tenants and a need to keep them satisfied, CBRE recognized it was also important to accurately bill energy costs and account for diverse occupancies. 3FFICIENT staff were […]

9

330 N Brand

This class A commercial building, located in Glendale California was built very efficiently for its time. However, the property manager realized that with changing technologies and rising energy costs, they needed to investigate improvements. They wanted unbiased guidance, so they utilized the services of 3FFICIENT’s engineers. 3FFICIENT’s Role: Working in concert with the municipal utility, […]

10

505 N Brand

This class A commercial building, located in Glendale California was built very efficiently for its time. However, the property manager realized that with changing technologies and rising energy costs, they needed to investigate improvements. They wanted unbiased guidance, so they utilized the services of 3FFICIENT’s engineers. 3FFICIENT’s Role: 3FFICIENT staff analyzed their energy use and provided an […]

11

550 N Brand

This class A commercial building, located in Glendale California was built very efficiently for its time and had even won a BOMA award. However, the owner’s recognized that energy efficiency raises property values, keeps costs down and reduces pollution. The utility had a good incentive program backed by technical assistance of 3FFICIENT’s engineers. Working in […]

12

700 N Central

This class A commercial building, located in Glendale California was built pretty efficiently for its time. However, the property manager knew that with changing technologies and rising energy costs, they needed to investigate improvements. They wanted unbiased guidance, so they utilized the services of 3FFICIENT’s engineers. 3FFICIENT staff analyzed their energy use and provided an […]

13

Glendale M.O.B.

A doctor’s group had a lot of comfort complaints in their 3-story medical office building. When they asked the engineers at the large hospital next door for ideas, they were referred to a 3FFICIENT engineer to diagnose and resolve their challenges. 3FFICIENT’s Role: 3FFICIENT staff was asked to analyze the building’s energy using systems and […]

14

801 N Brand

This class A commercial building, located in Glendale California was built pretty efficiently for its time. However, the property manager realized that with changing technologies and rising energy costs, they needed to investigate improvements. They wanted unbiased guidance, so they utilized 3FFICIENT. 3FFICIENT staff analyzed their energy use and provided an investment grade engineering study […]